BD POWER SYSTEM ALL IN ONE

Electrometa-welcome here::::::::::::::::::::::::::::



TOTAL GENERATION CAPACITY AT PRESENT: 21,629 MW(SEPT-2019)

1ST ELECTRICITY USED IN BD: AHSAN MANZIL ,1901

ELECTRICITY ACT FOLLOWED: 2018

HIGHEST GENERATED ELECTRICITY:12,893MW(29-5-2019)

ELECTRICITY IMPORTED FROM INDIA: 1197MW(2*500+197)

QUICK RENTAL PP: 1890MW

BIGGEST SOLAR POWER PLANT: 28MW, HNILA OF TEKNAF

TOTAL DISTRIBUTION LINE: 4,89,000CKT KM

TRANSMISSION LINE: 11,650CKT KM

TOTAL POWER PLANT: 145+

GRID SUBSTATION: 131

CONDUCTOR USED IN TRANSMISSION LINE: ACSR WITH OPTICAL FIBRE

SYSTEM LOSS: 11.96%

DISTRIBUTION LOSS: 9.60%

MAIN SOURCE OF FUEL: GAS(66%)

BIGGEST POWER PLANT: APSCL(1876MW)

HEART OF SUBSTATION: DC BACKUP

1ST HVDC SUBSTATION: VERAMARA

2ND HVDC SUBSTATION: DEBPUR,  COMILLA (500MW)

RAMPAL COAL PP: 1320 MW

MATARBARI ULTRA SUPER CRITICAL PP: 1200 MW

PAYRA THERMAL PP: 1320MW

COAL FIRED PP: BARAPUKURIA PP(525MW)

1ST NUCLEAR PP: RUPPUR NPP(2*1200MW)

2ND NPP: BARISAL (yet TO BE CONFIRMED)

400KV TRANSMISSION LINE: VERAMARA-INDIA

LARGEST TRANSMISSION LINE: KHULNA -VERAMARA(353CKT KM)

UNDER CONSTRUCTION LONGEST TRANSMISSION LINE: 700CKT KM( MOHESHKHALI- VULTA)

UNDER CONSTRUCTION 765KV TRANSMISSION LINE:

 MATARBARI (COX'S BAZAR)- VULTA (DHAKA)
BORONAGAR (INDIA)- PARBATIPUR

1ST ISOLATED GRID: HATIYA, NOAKHALI

NLDC SITUATED IN: AFTABNAGAR, RAMPURA, DHAKA

PER CAPITA ELECTRICITY CONSUMPTION: 510 KWh

HYDRO POWER PLANT: KAPTAI HYDRO POWER PLANT(230MW)

WASTE MANAGEMENT POWER PLANT: N.GANJ (3MW)

TOTAL UNIT RUNNING COUNTRYWIDE: 143+

UPCOMING HYDRO PP: SANGU RIVER(140MW), MATAMUHURI RIVER (75MW)

COUNTRY 1ST WIND POWER PLANT: SONAGAJI, FENI

100% POWER COVERAGE AREA: 340UPZILLA



COUNTRY 2ND WIND POWER PLANT: KUTUBDIYA, COX'S BAZAR



WASTE TO ENERGY TREATMENT PLANT: JALKURI, NARAYANGANJ (3MW)



FUEL SUPPLIER IN RNPP: TVEL FUEL COMPANY (RUSSIA)



PALLI BIDDUT SAMITI(PBS): 80


POWER HUB: ASUGANJ, SIDDHIRGANJ, PAYRA, SIRAJGANJ, MATARBARI, MODUNA.



LARGEST POWER HUB: MOHESHKHALI, 15 POWER PLANT IN A ZONE



HIGH GENERATION , LOW DEMAND AREA: SYHLET

LOW GENERATION HUGH DEMAND AREA: RANGPUR



NOTABLE GENERATION COMPANY:

 EGCB, RPCL ,BPDB  , APSCL ,BCMCL, KPCL,NWPGCL,WZPDCL, SUMMIT POWER, ORION,UNITED GROUP, SINHA GROUP etc.



TRANSMISSION COMPANY: PGCB



DISTRIBUTION COMPANY: DPDC,DESCO,PDB, NWPGCL,WZPDCL



FUEL TYPE: GAS, COAL, WIND, SOLAR, WASTE MANAGEMENT, HYDRO, HFO, HSD, LFO, OIL etc.



VOLTAGE LEVEL IN BD: 11-18KV, 33KV, 132KV, 220KV, 400KV.



COMMUNICATION MEDIUM SUBSTATION  to SUBSTATION: SCADA,PLCC


PER UNIT COST OF ELECTRICITY BY FUEL:



hydro- 1.32tk


gas: 2.8tk


coal: 7.38tk


furnace oil : 11.48tk


diesel: 19.30tk


 solar: 16.14tk


power imported from india: 5.94tk



MATARBARI PP PRODUCTION COST: 13TK/UNIT



ELECTRICITY COVERAGE: 93%

RENEWABLE POWER


CURRENT SITUATION

2041 PLAN




No comments: