TOTAL GENERATION CAPACITY AT PRESENT: 
20,854MW
1ST ELECTRICITY USED IN BD: 
AHSAN MANJIL ,1901 
ELECTRICITY ACT FOLLOWED: 
2018
HIGHEST GENERATED ELECTRICITY: 
11,623MW(19sep,2018)
ELECTRICITY IMPORTED FROM INDIA: 
1160MW(2*500+160)
QUICK RENTAL PP
: 1890MW
BIGGEST SOLAR POWER PLANT
: 28MW , HNILA OF TEKNAF
TOTAL DISTRIBUTION LINE
: 4,89,000CKT KM
TRANSMISSION LINE:
 11,396CKT KM
TOTAL POWER PLANT: 
137+
GRID SUBSTATION: 
131
SYSTEM LOSS: 
11.87%
DISTRIBUTION LOSS: 
9.60%
MAIN SOURCE OF FUEL: 
GAS(66%)
BIGGEST POWER PLANT:
 APSCL(1876MW)
RAMPAL COAL PP: 
1320 MW
MATARBARI ULTRA SUPER CRITICAL PP: 
1200 MW
PAYRA THERMAL PP: 
1320MW
COAL FIRED PP: 
BARAPUKURIA PP(525MW)
1ST NUCLEAR PP:
 RUPPUR NPP(2*1200MW)
2ND NPP
: BARISAL (yet TO BE CONFIRMED)
400KV TRANSMISSION LINE: 
VERAMARA-INDIA
PER CAPITA ELECTRICITY CONSUMPTION: 
464KWh
HYDROPOWER PLANT: 
KAPTAI HYDRO POWER PLANT(230MW)
WASTE MANAGEMENT POWER PLANT: 
N.GANJ (3MW)
TOTAL UNIT RUNNING COUNTRYWIDE: 
143+
PALLI BIDDUT SAMITI(PBS): 
80
POWER HUB
: ASUGANJ, SIDDHIRGANJ, PAYRA, SIRAJGANJ, MATARBARI, MODUNA.
NOTABLE GENERATION COMPANY:
 
EGCB, RPCL ,BPDB  , APSCL ,BCMCL, KPCL,NWPGCL,WZPDCL, SUMMIT POWER, ORION,UNITED GROUP, SINHA GROUP etc.
TRANSMISSION COMPANY: 
PGCB
DISTRIBUTION COMPANY: 
DPDC,DESCO,PDB, NWPGCL,WZPDCL
FUEL TYPE: 
GAS, COAL, WIND, SOLAR, WASTE MANAGEMENT, HYDRO, HFO, HSD, LFO, OIL etc.
VOLTAGE LEVEL IN BD: 
11-18KV, 33KV, 132KV, 220KV, 400KV.
COMMUNICATION MEDIUM SUBSTATION  to SUBSTATION:
 SCADA,PLCC
PER UNIT COST OF ELECTRICITY BY FUEL:
hydro- 1.32tk
gas: 2.8tk
coal: 7.38tk
furnace oil : 11.48tk
diesel: 19.30tk 
 solar: 16.14tk
power imported from india: 5.94tk
ELECTRICITY COVERAGE: 
95%